ESTATES

Estate in Anavyssos. The architectural configuration of the estate, covering an area of 5500 m2, began in March 2007 and was completed in May of the same year. The project lasted about two months.
Estate in Ilia. The construction of the estate, with an area of 15,000 m2, began in mid-September 2006 and was completed in mid-November of the same year. The project lasted about two months.
Back to top