5 star hotel in Anavyssos. The architectural configuration and reconstruction of the green space of the hotel, with an area of 16000 m2, took place in 2008.
5 star hotel in Karditsa. The architectural design and construction of the green space of the hotel, with an area of 30,000 m2, began in early November 2009 and was completed at the end of June 2010. The project was completed in about eight months.
5 star hotel in Cyprus. About 30 months were required for the architectural configuration and construction of the green space of the hotel, with an area of 90000 m2.